Company Experience

Reference List / Project Experience

Following is a list of some projects supplied and installed in association with our foreign partners:

       A.Some of the Power Sector Works:  By full Business Management & Coordination under

Late. Golam Rasul (Managing Director) through Link Centre International Ltd, Dhaka was:

  1. Dedicated supply of spare parts and field services to Bangladesh Power Development

Board (BPDB) from 1976 till 1996 for

2 x TG7 Skid Mounted Power Plants at Chittagong Steel Mills

1 x TG 7 Rail Mounted Power Plant at Khulna later on relocation to Bogra.

2 x TG14 Skid Mounted Power at Khulna

3 x TG16 Skid Mounted Shahjibazar

       2.Scheduled Maintenances and Rehabilitations of GT power plants to Bangladesh Power Development Board (BPDB)

2 x TG7 Skid Mounted Power Plants at Chittagong Steel Mills

1 x TG 7 Rail Mounted Power Plant at Khulna later on relocation to Bogra.

2 x TG14 Skid Mounted Power at Khulna

3 x TG16 Skid Mounted Shahjibazar

       3.Detailed Technical Proposal for New Power Plants and Upgradations & Modernization:

Rehabilitation of 2 x TG7 at Chittagong Steel Mill

Rehabilitation & Up gradation of 3 x TG16 at Shahjibazar

Relocation of 2 x TG7 at Chittagong to Shahjibazar

Offer for New Installation of 4 x TG50D5 at Ashuganj/Meghnaghat

     B. Some of the Power Sector Works:  By full Business Management & Coordination underGolam Chishty (Managing Director) through Link Centre International Ltd, Dhaka was:  
SL no. Contract No. Contract Description Contract Amount
      i.              Shahjibazar Power Plant BPDB Unit 2 TG16 (1996) Supply of Diffuser, Stack (Fiat Avio, Italy) USD. 600,000/-
    ii.              Shahjibazar Power Plant BPDB Unit 1 TG16 (1996) Supply of Full Bladed Rotor (Fiat Avio, Italy) USD. 1,200,000/-
   iii.            Goalpara Power Plant BPDB Unit 2 TG14 (1996) Spare part supply for Major Overhaul of gas turbine (Fiat Avio, Italy) USD. 200,000/-
   iv.            Shahjibazar Power Plant BPDB Unit 1 & 2 TG16 (1996-1997) Major Overhaul, balancing and commissioning of Unit 1 & 2 gas turbines (Fiat Avio, Italy) USD. 300,000/-
    v.            Goalpara Power Plant BPDB Unit 2 TG14 (1997) Supply of Spare parts: Transition Pieces, Combustor Baskets (Fiat Avio, Italy) USD. 316,000/-
   vi.            Shahjibazar Power Plant BPDB Unit 3 TG16 (1997) Supply of Spare Parts: IGV, Compressor Blades (Fiat Avio, Italy) USD. 467,000/-
 vii.            Bogra Power Plant BPDB  TG7 (1997-1998) Supply of Spare Parts for Major Overhauling of Trailer Mounted 7Mw gas turbine USD. 300,000/-
viii.            Shahjibazar Power Plant BPDB Unit 3 TG16 (1998) Major Overhaul, balancing and commissioning of Unit 3 gas turbines (Fiat Avio, Italy) USD. 175,000/-
   ix.            Shahjibazar Power Plant BPDB Unit 1 & 2 TG16 (1998-1999) Hot Gas Path Inspection, Minor Overhauling Unit 1 & 2 gas turbines (Fiat Avio, Italy) USD. 109,000.00
     x.            Shahjibazar Power Plant BPDB Unit 3 TG16 (1999) Hot Gas Path Inspection, Minor Overhauling Unit 3 gas turbines (Fiat Avio, Italy) USD.75,000/-
   xi.            Westmount 130Mw Power Plant 2 x W251B11/12 (1999) Hot Gas Path Inspection, Minor Overhauling Unit 1 &2  gas turbines (Fiat Avio, Italy) USD. 250,000/-
 
  Westmount 130Mw Power Plant 2 x W251B11/12 (2000) Supply of Spare Parts: IGV, Compressor Blades, Buckets, Bearings etc (Fiat Avio, Italy) USD. 650,000/-
xii.   Haripur 100Mw Power Plant BPDB 3 x MW251B7/8 (2000) Spare part supply for Major Overhaul of gas turbine Units 1,2, & 3 (Fiat Avio, Italy) USD. 1,700,000/-
xiii. Shahjibazar Power Plant BPDB Unit 1 & 2 TG16 (2001-2002) Major Overhaul, balancing and commissioning of Unit 1 & 2 gas turbines (GTT, Italy) USD. 235,000/-  
xiv Westmount 130Mw Power Plant 2 x W251B11/12 (2003) Supply of Mee Fog  Inlet Fogging With complete fabrication fuel efficiency and heat rate management. (MEE Fog, USA) USD. 4,00,000/-    
xv. Energy Prima Ltd. (2007-2008)   Energy Prima Ltd. (2008) Supply of 4 x Rolls Royce Avon gas turbines 50Mw Fenchuganj Rental Power Plant (GTS, USA) Supply of Mee Fog  Inlet Fogging With complete fabrication fuel efficiency and heat rate management. (MEE Fog, USA) USD. 14,000,000/-       USD.1,000,000/-
 

Preparation of Detailed Technical Proposal for New Power Plants and Upgradations & Modernization:


a.Rehabilitation of 2 x TG7 at Chittagong Steel Mill Area (1998) Relocation of 2 x TG7 at Chittagong to Shahjibazar Power Station (1999-2000)
c. Rehabilitation & Upgradation of 3 x TG16 at Shahjibazar Power Station (2008-2009)
d. Offer for New Installation of 2 xTG50D5 at Rubya Power, Chittagong (2011-2014)
e. Refurbishment of WHB and Exhaust System of Energis 55Mw HFO Power Plant Units 1 to 6, Shikalbaha, Anowara, Chittagong (2016)
f. Complete Inspection and Valuation of Westmont 130Mw CCPP, Baghabari, Sirajganj (2019) Comprising of 2 x Westinghouse Electric W251B11/12 Gas Turbines in CCPP
g. Complete Technical & Commercial Proposal for 550Mw (+/- 10%) Shanta Ethos New Haripur Combined Cycle Power Plant Project. (2018 – 2019) Comprising of 2 X FIAT TG50D5U Gas Turbine in CCPP
h. Complete Technical & Commercial Proposal for 600Mw (+/- 10%) Meghnaghat Phase 2, Unique Power Ltd. A concern of Unique Group. (2020 – 2023) Comprising of 1 X Ansaldo Energia GT36S5 Gas Turbine in CCPP
i.Complete Technical & Commercial Proposal for 600Mw (+/- 10%) Confidence Power Holdings Ltd. A concern of Confidence Group. (2021) Comprising of 1 X Ansaldo Energia GT36S5 Gas Turbine in CCPP
j.Complete Technical & Commercial Proposal for 600Mw (+/- 10%) & 540Mw (+/- 10%), Bangla Trac Power Holdings Ltd. A concern of Bangla Cat Group. (2021-2022) Comprising of 1 X Ansaldo Energia GT36S5 Gas Turbine in CCPP & Comprising of 1 X Ansaldo Energia GT26
k.Gas Turbine in CCPP Complete Technical & Commercial Proposal for 2 x 120Mw (+/- 10%) 50% Hydrogen + 50% Natural Gas blended CCPP, Seacom Resources Limited. A concern of Premier Cement Ltd. (2023 – Pending) Comprising of 2 X Ansaldo Energia AE64.3A Gas Turbines in CCPP
l.Complete Technical & Commercial Proposal for 2 x 120Mw (+/- 10%) 50% Hydrogen + 50% Natural Gas blended CCPP, Solar Electro Bangladesh Ltd. (2024-Pending) Comprising of 2 X Ansaldo Energia AE64.3A Gas Turbines in CCPP
 

C.Some of the Power Sector Works:  Full Business Management & Coordination under Eng. Md. Abu Yusuf (Executive Director, Technical)  
SL no. Contract No. Contract Description Contract Amount
 xii.              Northern Power Solutions Ltd, Bangladesh Supply of pumps, valves, compressors, pipes, supply and fabrication of fuel storage tanks and exhaust stack, erection of all mechanical equipment for 50 Mw HFO Power Plant at Kathakali, Rajshahi BDT 2,10,000,000/-
xiii.              Concord Progoti Consortium Ltd., Bangladesh Supply of pumps, valves, compressors, pipes, supply and fabrication of fuel storage tanks and exhaust stack, Supply and installation of 33 kV Sub-station, erection of all mechanical equipment for 50 Mw HFO Power Plant at Kodda, Gazipur €2,281,000/- BDT 85,700,000/-
xiv.              SADELMI-BUSI POWER Italy Rehabilitation of Generator & Electrical Substation and installation of DCS System, Digital Governor System and Static excitation system of Karnafuly 50 MW Hydro Power Station, Unit 3. BDT 15,172,000/-
 xv.              SADELMI-BUSI POWER Italy Rehabilitation of Generator & Electrical Substation and installation of DCS System, Digital Governor System and Static excitation system of Karnafuly 50 MW Hydro Power Station, Unit 4. BDT 22,000,000/-
xvi.              ANDRITZ HYDRO, Italy Rehabilitation of Turbine & its auxiliaries of Karnafuly 50 MW Hydro Power Station, Unit 3. BDT 42,000,000/-
xvii.              SKODA Export, Czech Rep.; Contract No. 09685 Dated. 29.11.2007 Repair Rehabilitation work of Khulna 60 MW Steam Turbo Generator with its auxiliaries on turnkey basis. $ 1,595,130/- BDT    5,800,000/-
xviii.              SKODA Export, Czech Rep.; Contract No. Pur-427/2008 Dated. 30.4.08 Supply of Boiler Water Wall Tubes for Khulna 110 MW Power Station. $ 659,411/-
xix.              SKODA Export, Czech Rep.; Contract No. 09660 Dated. 4.12.2006 Supply, Installation & commissioning of Gas Booster Compressor on Turnkey Basis. $ 4,136,946/-BDT 11,251,895/-
 xx.              SKODA Export, Czech Rep.; Contract No.PUR 426Dated: 13.10.2007 Supply of Air Heater Tubes Khulna Power Station $ 150,000/-
xxi.              Summit 114 Mw HFO Barishal power plant. 2015 Fabrication & installation of HFO Storage tank 13 Nos. Service BDT 35,500,000/-
xxii.              189 Mw Meghnaghat Power Pant Pendaker 2015/16 Restoration project Meghnaghat 189 Mw steam turbine turnkey basis with DOSSAN SKODA S.R.O BDT 3,52,100,000/-
 
  1. Telecommunication Works:  AS A project supervisor (Eng. Md. Abu Yusuf Director Technical)
 
SL no. Client name Contract Description
        i.            DETEC (Ericsson Project) Base Transceiver Station (BTS) Installation, Commissioning & Integration
       ii.           DETEC (Ericsson Project) Line of Sight Survey (LOSS)
       iii.          DETEC (Ericsson Project) Complete Civil, Mechanical & electrical works for PDH & SDH sites
       iv.          DETEC (Sheba Telecom) Complete Civil, Mechanical & electrical works for PDH & SDH sites
       v.           DETEC (Sheba Telecom) Business Development for Operation and Maintenance for BTS, BSC and MSC including Genset and Air Conditions
        i.            DETEC (Sheba Telecom) Dismantling work of existing PDH/SDH sites
       ii.           R&A (TMIB International) Up gradation work of Base Transceiver station (BTS) sites.
       iii.          R&A (Motorola) Base Transceiver Station (BTS) Installation, Commissioning & Integration
       iv. Comtech (Sheba telecom) Complete Civil, Mechanical & electrical works for PDH & SDH sites
        v. Ayan Trading (TMIB International) Complete Civil, Mechanical & electrical works for PDH & SDH sites
  Profile of Key Technical Personnel

1. Name: Eng. Mohammed Abu Yusuf (Jashim)

Designation: Executive Director (Technical)

Education: Bachelor of Science (Mechanical)
Daffodil University of Dhaka
Work Experience: 16 years’ experience in Power plant rehabilitation, overhauling work at Khulna 110 Mw power stations, Khulna 60Mw power station, Shikalbaha 60MW power station with SKODA EXPORT CO.LTD. , Czech Republic, through SBS International Business Ltd. 7 years’ experience in GAS&Telecommunication sector in different IBS project, PSS Project, LOSS Project working with  Dipon Gas & DETEC, Malaysia), R&A Telecommunication, Malaysia

2.
Name: Sup. Eng. Mortola Lorenzo
Designation: Chief Technical Consultant Education: Master of Science (M.Sc. Industrial Administration) Bachelors of Science, (B.Sc. Mechanical Heavy Industrial) University of Torino, Italy
Qualification: Gas Turbine NDT Specialist Gas Turbine Hot Path Grid Blasting Specialist Registered Gas Turbine Power Plant Erection & Maintenance Manager
Work Experience: FROM 1961 TO 1968: FIAT AVIO AIRCRAFT PROJECT DPT; FIAT AUTOMOBILE LINE PRODUCTION; FIAT AUTOMOBILE MAINTENANCE DPT; FIAT RAILWAY HEAVY INDUSTRY   FROM 1968 TO 2000: FIAT GRANDI MOTORI, FIAT TTG, FIAT AVIO   GAS TURBINE POWER PLANT RESPONSIBLE MECHANICAL PROJECTS, PROJECT MANAGER, RESIDENT ENGINEER, SITE MANAGER, ADVISORY SERVICE MANAGER, PREPARATION OF POWER PLANT SPECIFICATION, PREPARATION OF BIDS, POWER PLANTS UPRATINGS, MAINTENANCE SPECIALIST FOR THE FOLLOWING TYPE OF GT:TG500 (W91), TG7 (W101), TG14, TG16 (W191), TG25, TG3000, TG 20B (W251B), TG20B2 (W251B2), TG20B7/8 (W251B7/8), TG20B9/10 (W251B9/10), TG20B 11/12 (W25111/12), TG50 (W501A), TG50B (W501AA), TG50C (W501D4), TG50D5 (W501D5)    Specialist In:   COMBUSTION INSPECTION, HOT GAS PARTS INSPECTION, MAJOR INSPECTION, PARTIAL INSPECTION, EMERGENCY INSPECTION, ALIGNMENTS,GENERATORS’ MAJOR INSPECTIONS, MODIFICATIONS, SYSTEM INPROVEMENTS, GANT CHART PREPARATION, SPARE PARTS PLANNING, POWER PLANTS RE-HABILITATION, STUDY & PROJECT MODIFICATION ON AUXILIARIES OF THE POWER PLANT, MANPOWER PLANNING, PROJECT MANAGEMENT, POWER PLANT TECHNICAL ADVISOR, PLANNING OF SCHEDULED MAINTENANCE. Place of Activity: ITALY: CODRONGIANUS (ENEL POWER PLANT) TG16, ALESSANDRIA (ENEL POWER PLANT) TG50C, MADDALONI (ENEL POWER PLANT) TG50C, FIUMICINO (ENEL POWER PLANT) TG50, PIETRAFITTA (ENEL POWER PLANT) TG50C, TURBIGO (ENEL POWER PLANT) TG50D5 LYBIA: BENGHAZI TG500 & TG7 IRAQ: DAURA & DIBIS TG20B7/8 YEMEN: ADEN TG7 TUNISIA: EL BORMA TG16, GANNOUCH TG20B7/8 TURKEY: ALIAGA TG20B2, GOLCIUK TG20B2 ALGERIA: IN AMENAS TG500 &TG7, HASSY MESSAUD TG7 BELGIUM: SOLVAY TG16 & TG20B2 NEDERLAND: HYDRO AGRY TG20B2 INDIA: DUVARAN TG25 PAKISTAN: TG7, TG16, TG50D BANGLADESH: CHITTAGONG TG7, KHULNA TG14, SHAHJIBAZAR TG16, BOGRA TG7, HARIPUR MW251b7/8, BAGHABARI WESTMOUNT W251B11/12, SIRYA: ZAIZUN TG50D5 SAUDI ARABIA: DAMMAM TG7, TG16, TG20B, TG20B2, W251B2, MHI501G; AZIZIAH TG7; NAJRAN TG20B7/8; AL JOWF TG20B7/8; JOUEMAH MHI301 & 501; QUAISUMA GE FR 5 & 6 Work Experience: FROM 2001 TO 2013: KAFOU TECHNICAL SERVICE  Specialist In:   COMBUSTION INSPECTION, HOT GAS PARTS INSPECTION, MAJOR INSPECTION, PARTIAL INSPECTION, EMERGENCY INSPECTION, ALIGNMENTS, GENERATORS’ MAJOR INSPECTION, MODIFICATIONS, SYSTEM INPROVEMENTS, GANT CHART PREPARATION, SPARE PARTS PLANNING, POWER PLANTS RE-HABILITATION, STUDY & PROJECT MODIFICATION ON AUXILIARIES OF THE POWER PLANT, FEASIBILITY STUDIES FOR IMPROVEMENTS AND MODIFICATIONS, MANPOWER PLANNING, PROJECT MANAGEMENT, POWER PLANT TECHNICAL ADVISOR, PLANNING OF SCHEDULED MAINTENANCE, WRINGING SEPARATOR APPLICATION FOR GAS SALES PLANT (LAYOUT DESIGN, PROJECT & TECHNICAL SUPPORT), COALESCER FILTER APPLICATION FOR GAS SALES PLANT (LAYOUT DESIGN, PROJECT & TECHNICAL SUPPORT), INSTALLATION OF ALL PIPING AT SCC HUFUF POWER PLANT X 3 FRAME 6 (PROJECT COORDINATOR), FUEL OIL UNLOADING STATION (DESIGN & PROJECT), INSTALLATION OF SERVICE AIR COMPRESSOR STATION (PIPING DESIGN & PROJECT MANAGEMENT), REPLACEMENT OF LUBE OIL COOLERS FOR GAS TURBINES & GENERATORS (STUDY, DESIGN & PROJECT MANAGEMENT), STUDY OF TENDERS’ WORK SCOPE, PREPARATION OF TECHNICAL OFFERS, RFQ FOR MATERIALS PROCUREMENTS. Place of Activity: NAJRAN: TG20B7/8 (SEC POWER PLANT) AL JAWF: TG20B7/8 (SEC POWER PLANT) AL JUBAIL: TG20B2 (SWCC POWER PLANT) AL JUBAIL: TG16 (MARAFIQ POWER PLANT) HUFUF: FRAME 6, FRAME 9 QAISUMA: FRAME 6; FRAME 5 BANGLADESH: PREPARATION OF A POWER PLANT PROJECT EQUIPPED WITH 2 NOS OF TG50D5, PREPARATION OF PROJECT FOR REHABILITATION OF 3 NOS OF TG16 (FEASIBILY STUDY, ECONOMICAL EVALUATION, TECHNICAL OFFER), FEASIBILY STUDY FOR MAINTENANCE CONTRACT RELATED TO 2 NOS OF BARGE MOUNTED W251B11/12 DAMMAM: TG16, TG20B, TG20B2, W251B2, MHI501G (SEC POWER PLANT) RIYADH PP4: BBC GT (SEC POWER PLANT) RIYADH PP9: FRAME 7, FRAME 9 (SEC POWER PLANT) RIYADH PP7, PP8 & PP9 (SEC POWER PLANTS) JAZAN: W501D5 (SEC POWER PLANT) HAFR AL BATIN: W251B7/8 (KKMC POWER PLANT) TABUK: W251B7/8 (KAMC POWER PLANT) SHAROURA: WARTSILA DIESEL GENERATORS (SEC POWER PLANT) BISHA: MAN B&W DIESEL GENERATORS, BBC GT (SEC POWER PLANT) JUAYMAH: MHI301G & MHI501G (SEC POWER PLANT) SAFANIYAH: MHI501G (SEC POWER PLANT) BERRY: W501D4 (SEC POWER PLANT) SHEDGAM: W501D4, FRAME 7 FRAME 9 V.2 (SEC POWER PLANT) FARAS: W501D4, FRAME 7, FRAME 9 V.2 (SEC POWER PLANT) OTHAMANIA: FRAME 7, FRAME 9 V.3 (ARAMCO POWER PLANT) Work Experience:FROM NOVEMBER 13 UP TO PRESENT: SADELMI POWER ARAR SR MECHANICAL SUPERINTENDENT FOR THE ARAR POWER PLANT EXTENSION X 2 NOS OF SIEMENS GTG 2000E (C0)

Contact Information: Mobile:+39 3332466808, +966 555757934
Email: lmortola@tiscali.it